MINT XDesign · Build · MaintainDiscuss your project ↗

Singapore · Service guide

Landed Property Additions & Alterations Singapore

Understand what can change before deciding what to keep.

Landed A&A retains an existing house while altering or extending it within the applicable planning and structural requirements. Feasibility depends on the property type, approved building, site constraints and proposed changes.

Plan your project ↗

What the scope can include

Agree the included works, quantities and exclusions before comparing quotations. The following items form a starting point for a site-specific scope.

  • Site survey and existing-building condition review
  • Terrace, semi-detached and bungalow layout coordination
  • Foundation, beam and proposed opening assessment by a PE
  • Envelope, setback and services coordination with the QP
  • Construction scope, phasing and neighbour protection planning

Budget planning in Singapore dollars

These are illustrative early budgeting allowances, not verified market averages or a Mint X quotation. Site inspection and a defined specification are needed for pricing. GST, professional fees, authority charges, specialist equipment and abnormal conditions are excluded unless expressly included.

Early planning allowances — SGD
ScopeAllowance / pricing basis
Initial survey and feasibility allowanceS$3,000–15,000+
Alteration works versus a full rebuildCompare measured scopes on the same exclusions

Approvals and responsibilities

URA’s applicable landed housing and envelope controls guide feasibility. Do not apply strata-landed or conservation rules interchangeably to a conventional landed house.

Items to confirm before appointment
Responsible partyReview item
URAPlanning or change-of-use review where applicable
BCA / QP / PEStructural design, approval and permit review where applicable
SCDFFire safety review for affected systems and layouts

Project stages and timing

A limited alteration may be measured in weeks; substantial extensions can run for months after approvals. Use an inspected scope rather than a generic completion promise.

  1. Collect title information, survey and approved drawings.
  2. Review retained structure and proposed floor-area changes.
  3. Resolve applicable planning, structural and fire requirements.
  4. Agree temporary accommodation, protection and construction sequence.

Frequently asked questions

Are attic heights and setbacks the same for every landed house?

No. Housing type, location and applicable controls matter. Ask the appointed QP to check the property against the relevant URA guidelines.

How do I choose between A&A and rebuilding?

Compare structural condition, usable space, approval feasibility, construction disruption and the total cost of each defined option.

Related services

Official guidance

Editorial review: 29 October 2026. Authority requirements and project eligibility should be checked by the appointed professionals before work starts.