Landed Teardown & Rebuild Planning Singapore

Plan the complete route from existing house to handover.

A landed rebuild replaces the existing house with a new building. It requires an integrated brief, site investigations, professional design, relevant approvals and an appropriately licensed builder for the appointed works.

Plan your project ↗

What the scope can include

Agree the included works, quantities and exclusions before comparing quotations. The following items form a starting point for a site-specific scope.

  • Design brief, survey and soil investigation coordination
  • Demolition, foundation and structural package planning
  • Envelope, M&E and interior scope integration
  • Construction sequencing and cost-plan review
  • Testing, completion documentation and TOP/CSC coordination as applicable

Budget planning in Singapore dollars

These are illustrative early budgeting allowances, not verified market averages or a Mint X quotation. Site inspection and a defined specification are needed for pricing. GST, professional fees, authority charges, specialist equipment and abnormal conditions are excluded unless expressly included.

Early planning allowances — SGD
ScopeAllowance / pricing basis
Illustrative construction-only allowanceS$350–650+ / sq ft of GFA
Consultants, demolition, abnormal ground works, fees and taxesConfirm separately in the cost plan

Approvals and responsibilities

Check the appointed builder’s licence under BCA’s Builders Licensing Scheme. Planning, structural and completion requirements must be coordinated by the appointed professional team.

Items to confirm before appointment
Responsible partyReview item
URAPlanning or change-of-use review where applicable
BCA / QP / PEStructural design, approval and permit review where applicable
SCDFFire safety review for affected systems and layouts

Project stages and timing

Use a project-specific programme covering design and approvals before construction. A full rebuild is a multi-stage project and should not be priced or scheduled from floor area alone.

  1. Survey the site, investigate ground conditions and agree the brief.
  2. Develop design, cost plan and applicable authority submissions.
  3. Sequence demolition, foundations, frame, enclosure and services.
  4. Complete inspections, documentation and occupation-clearance steps.

Frequently asked questions

Does the square-foot allowance cover the entire project?

No. This is an illustrative early planning allowance, not a Mint X quotation. Define GFA, specifications, demolition, ground works, consultants, fees, external works and taxes separately.

Is BCA contractor registration the same as a builder licence?

No. Registration workheads and builder licensing are distinct. Verify the appointed builder’s current licence and suitability for the proposed works before appointment.