Commercial Additions & Alterations Works Singapore

Resolve the structure and approvals before construction.

Commercial A&A changes an existing building rather than simply refreshing finishes. Changes to floor openings, load paths, mezzanines or layouts may need coordinated architectural, structural and fire safety review before work begins.

Plan your project ↗

What the scope can include

Agree the included works, quantities and exclusions before comparing quotations. The following items form a starting point for a site-specific scope.

  • Existing drawing and site-condition review
  • Scope definition for structural and non-structural works
  • PE design and QP submission coordination where required
  • Trade sequencing, temporary works and occupied-site planning
  • Inspection, testing and as-built documentation

Budget planning in Singapore dollars

These are illustrative early budgeting allowances, not verified market averages or a Mint X quotation. Site inspection and a defined specification are needed for pricing. GST, professional fees, authority charges, specialist equipment and abnormal conditions are excluded unless expressly included.

Early planning allowances — SGD
ScopeAllowance / pricing basis
Initial feasibility and coordination allowanceS$3,000–12,000+
Structural construction worksElement-by-element quotation after design

Approvals and responsibilities

Coordinate URA planning requirements, BCA structural approvals and SCDF fire safety changes as applicable. A&A classification is assessed against authority criteria, not chosen as a marketing label.

Items to confirm before appointment
Responsible partyReview item
URAPlanning or change-of-use review where applicable
BCA / QP / PEStructural design, approval and permit review where applicable
SCDFFire safety review for affected systems and layouts

Project stages and timing

Allow a separate feasibility and approval stage before committing to a site programme. Structural design, agency comments and temporary works can materially change duration.

  1. Establish existing use, approved drawings and site constraints.
  2. Appoint relevant QPs and review structural and planning feasibility.
  3. Complete the applicable approval and permit stages.
  4. Construct to approved details and close out inspections.

Frequently asked questions

Can a mezzanine be treated as normal interior renovation?

Do not assume so. Added floor area, loading, escape and planning implications require review by the appropriate professionals.

Must every A&A job use CORENET X?

The submission route depends on the project and current rollout criteria. The appointed QP should confirm the applicable route, including treatment of ongoing projects.

Related services

Official guidance

Editorial review: 29 October 2026. Authority requirements and project eligibility should be checked by the appointed professionals before work starts.