F&B Fit-Out & Commercial Kitchen Renovation Singapore

Connect the dining concept to a workable kitchen.

F&B renovation must coordinate customer flow with food preparation, exhaust, drainage, power and fire safety. Review the proposed use and existing services before signing off a kitchen layout or placing equipment orders.

Plan your project ↗

What the scope can include

Agree the included works, quantities and exclusions before comparing quotations. The following items form a starting point for a site-specific scope.

  • Dining layout and kitchen workflow coordination
  • Stainless steel fabrication and cleanable finishes
  • Slip-resistant flooring and wet-area detailing
  • Kitchen exhaust, make-up air and equipment-load coordination
  • Grease management, drainage and fire services coordination

Budget planning in Singapore dollars

These are illustrative early budgeting allowances, not verified market averages or a Mint X quotation. Site inspection and a defined specification are needed for pricing. GST, professional fees, authority charges, specialist equipment and abnormal conditions are excluded unless expressly included.

Early planning allowances — SGD
ScopeAllowance / pricing basis
F&B fit-out, initial planning allowanceS$150–300+ / sq ft
Major equipment and base-building upgradesSeparately scoped

Approvals and responsibilities

Review SFA food shop licensing and the submitted layout, PUB sanitary and grease requirements, and SCDF fire safety requirements. Kitchen exhaust and suppression design must suit the actual equipment and approved design.

Items to confirm before appointment
Responsible partyReview item
Building managementPermits, deposits, access and working hours
Appointed professionalsReview affected structure, fire safety and licensed trades
Site teamRisk assessment, protection and agreed method statements

Project stages and timing

An initial programme might allow 6–12 weeks on site after design and approvals; exhaust routes, equipment and licensing can extend the opening programme.

  1. Check permitted use, lease constraints and base-building capacities.
  2. Coordinate kitchen equipment, exhaust route and drainage layout.
  3. Complete applicable SFA, landlord and professional submissions.
  4. Fit out, commission systems and complete licensing steps before opening.

Frequently asked questions

Does a restaurant need a grease trap?

PUB sets grease management requirements. The appointed team must confirm capacity, discharge arrangements and any applicable exception with PUB rather than selecting by floor area alone.

Does finishing renovation mean I can open?

No. The operator must complete applicable licensing and clearance requirements, including SFA requirements, before trading.